| Year | Project | Client | Consultant |
|---|---|---|---|
| Current | Restoration and Repair Works of House No.49A and 49B, Lai Chi Wo Village, Sha Tau Kok, N.T. | Hong Kong Countryside Foundation | |
| Current | Footing Strengthening Works and Brick Wall Repair to Man Lun Fung Ancestral Hall, San Tin, Yuen Long | AMO | |
| Current | Restoration Works to Hip Tin Temple, Sha Tau Kok | AMO | |
| Current | Redeoration of Walls, Relay Hakka Pitched Roof and Miscellaneous Repair Works at Chung Old House and Former Chung Ancestral Hall at CAS Yuen Tun Camp | ASD | |
| Current | Repainting for the Middle Hall of Liu Man Shek Tong Ancestral Hall, Sheung Shui | AMO |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2025 | Restoration and Repair Works of Grain Store (Site A) and House No.49 (Site B) at Shui Hau Village, Lantau Island, Hong Kong | The Chinese University of Hong Kong | |
| 2025 | Restoration Works of Old House at DD141, L841 Mui Tse Lam, Sha Tau Kok | The Chinese University of Hong Kong | |
| 2025 | 復修「荔枝窩東門、西門牌樓圍牆」及「活化公共空間工程」 | Hong Kong Countryside Foundation | |
| 2025 | Restoration works at Block 3&9, Tai Kwun | The Jockey Club CPS Limited | Purcell |
| 2025 | Timber, Brickwork and Miscellaneous Repair Works at Former Yamen Building of Kowloon Walled City | ASD | |
| 2025 | Timber, Brickwork, Plumbing & Drainage and Miscellaneous Repair Works at Former Kowloon British School , 136 Nathen Road, Tsim Sha Tsui | AMO |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2024 | Consolidation Works to Mural at Block 10, Tai Kwun | The Jockey Club CPS Limited | |
| 2024 | Block 17 Repair and Maintenance Works at Tai Kwun | The Jockey Club CPS Limited | Purcell |
| 2024 | Restoration Works of Lee Mansion at DD54 Lots 258, 262, 263 and 393, Kuk Po, Sha Tau Kok, N.T. | The Chinese University of Hong Kong | |
| 2024 | Construction Works to Repair Current House at Kuk Po, Luk Keng | The Hong Kong Polytechnic University | |
| 2024 | Consoliation Works to Painted Sign at Block 3 and Mural at Block 10, Tai Kwun | The Jockey Club CPS Limited | Purcell |
| 2024 | Term Contract 2021 to 2024 for Maintenance and Repair Works in Chinese Temples (Hong Kong Island) for Chinese Temples Committee | CTC | Spence Robinson Limited |
| 2024 | Maintenance Works at 12 Moorsom Road, Jardine’s Lookout | Private Owner | |
| 2024 | Replacement of GFRC Simulated Timber Flooring at Cultural Plaza of Centraland Western District Promenade (Central Section), Tarmar | Private Owner | |
| 2024 | Repair Works of Timber Members at Chapel of Hong Kong Cemetery, Wong Nai Chung Road, Wan Chai | ASD | |
| 2024 | Re-roofing and Miscellaneous Repair Works at Old Stanley Police Station, 88 Stanley Village Road, Stanley | ASD | |
| 2024 | Refurbishment for Main Staircases at Blocks B and D for the Education University of Hong Kong | The Education University of Hong Kong | |
| 2024 | 鹽田梓村5號屋復修 | Private Owner |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2023 | Landscaping & Paint Works, and Construction of Architectural Prototype for Ng To, Kuk Po, Sha Tau Kok, Hong Kong. | The Chinese University of Hong Kong | Ptah Heritage Ltd |
| 2023 | Restoration of Architecture and Built-Enviroment for the Annex Block, Kai Choi School, Kuk Po Village, Sha Tau Kok, Hong Kong | The University of Hong Kong | |
| 2023 | Open-up ceiling insulation board on 2/F Block 9, Tai Kwun | The Jockey Club CPS Limited | |
| 2023 | 保良局門口更亭維修 | Po Leung Kuk | |
| 2023 | Repair the Defective Sliding Roller Type Double Leaf Bronze Door and Provide New Mortice Lock in Western Magistracy Building | ASD | |
| 2023 | Removal of outdated signange at Tai Kwun | The Jockey Club CPS Limited | |
| 2023 | Repair Works of External Wall (Elevation C&D) for Caritas Ngau Tau Kok Social Centre at 1 On Tak Road, Nagu Tau Kok, Kowloon | Private Owner | |
| 2023 | Repartitioning Works for Shop 66-67, 68 and 73-74 at Ocean Work | Private Owner | |
| 2023 | Additional Works to Debonded Rendering and Spalled Concrete of Ceiling and arch at Lui Seng Chun, 119 Lai Chi Kok Road, Mong Kok | ASD | |
| 2023 | Repair Cracked/Spalled Concrete and Losse/Hollow Plaster at Balconies at Former French Mission Building, Battery Path, Central | ASD | |
| 2023 | Roof and Timber Truss Survey at the Crossing and Transepts of St. John’s Cathedral and Reroofing Works at Li Hall, No. 4-8 Garden Road, Central | AMO | |
| 2023 | Former Marine Police Headquarters Compound at Canton Road, Tsimshatsui, Kowloon (1881 Heritage) | AMO | |
| 2023 | Supply and Installation Work of Tactile Tile Path Connecting 5/F Chong Yuet Ming Cultural Centre, HKU | The University of Hong Kong | |
| 2023 | 保育樓外墻修執工程 | 新恆基國際物業管理有限公司 | |
| 2023 | Tai Kwun – Revetment Wall R53 Repairs | The Jockey Club CPS Limited | Purcell |
| 2023 | Alteration and Addition Works at Marching Deck at Podium Floor | The Hong Kong Polytechnic University | AJAR LIMITED |
| 2023 | Repair and Replace Defective Timber Purlin at Old House, No. 10 Wong Chuk Hang San Wai, Wong Chuk Hang, H.K. | ASD | |
| 2023 | 茂蘿街7號 – 外墻勘察檢驗專業顧問服務及外墻維修工程 | China Overseas Property | |
| 2023 | Repair Defective External Wall Plaster outside 1/F Guard Room 2 at Former CE Office, 28 Kennedy Road | ASD | |
| 2023 | Repair works and Replace Timber Window at HKU Main Hall | The University of Hong Kong | |
| 2023 | Replacement Works for Defective Metal Glazed Doors at Block 1, Block 6 and Block 14 | The Jockey Club CPS Limited | |
| 2023 | Restoration works at Lot 263 to 265, Lai Chi Wo Village, Sha Tau Kok | The Hong Kong Countryside Foundation | |
| 2023 | Repair Works to Wall Cracked and Internal Plaster at Lui Seng Chun, 119 Lai Chi Kok Road, Mong Kok | ASD | |
| 2023 | Repair and Maintenance Works at Tsung Tsin Mission of Hong Kong Kau Yan Church | Tsung Tsin Mission of Hong Kong Kau Yan Church | ANG Studio Limited |
| 2023 | Maintenance Works of Lutheran Yan Kwong Church (Church Building, Former Primary School and Former Kindergarten) in No.35 Ma On Shan Road | The Evangelical Lutheran Church of Hong Kong | LWK Conservation Ltd. |
| 2023 | Planned Maintenance 2022/23 – Redecoration and Miscellaneous Repair Works at Green Island Lighthouse Compound, Green Island | ASD | |
| 2023 | Project of Redecoration and Miscellaneous Repair Works at Old House, No.10 Wong Chuk Hang San Wai, Wong Chuk Hang, H.K | ASD |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2022 | Preventive Maintenance Programme of Roadside Man-Made Slopes/Retaining Walls in Urban Region – Temporary Relocation and Storage of Historic Flower Pots at King Yin Lei | Private Owner | |
| 2022 | Foundation construction in Old house and Mural House | CUHK School of Architecture | |
| 2022 | Maintenance Works of Tin Hau Temple, Sai O, Kat O, N.T. | Pirvate Owner | LWK Conservation Ltd. |
| 2022 | Restoration and Repair Works of House No. 43 and 43 at Ng To, Kuk Po, Luk Keng, N.T., HK. | CUHK School of Architecture | Ptah Heritage Ltd |
| 2022 | Repair and Maintenance Works to Kwong Yuet Tong Public Office at Nos. 16-17, Ching Lin Terrace, Kennedy Town, Hong Kong | Private owner | |
| 2022 | Planned Maintenance 2021/22 – Relay of Pitched Roof, Repair of Timber Element, Redecoration and Miscellaneous Repairs Works at Old House, Hoi Pa Village at Tak Wah Park, Tsuen Wan | ASD | |
| 2022 | Metal Balustrade and Railing Replacement Works at La Hacienda | Private Owner | |
| 2022 | Roof Structure Repair Works at No.7 Nolkford Road, Kowloon Tong, Kowloon | Private Owner | |
| 2022 | Replacement of Windows and Window Frames at Occupied Flat 1 of Felix Villas for The University of Hong Kong | Private Owner | |
| 2022 | Prevention of Deteriration of Built Environment and Landscape Improvement in Lai Chi Wo Village – Site Clearance and Artefacts Salvaging Works for House Lot Service for Prevention of Deterioration of Built Environment and Landscape Improvement in Lai Chi Wo Village Project | The Hong Kong Countryside Foundation | 2 square Metres Design Limited |
| 2022 | Revitalising Mui Tsz Lam with Experimental Restoration | CUHK School of Architecture | Ptah Heritage Ltd |
| 2022 | Septic tank open-up and survey at four locations in Lai Chi Wo Village | Private owner | |
| 2022 | Restoration Work at Lot 200, 240 and 2201, 263 to 265, 271 and 272 and 285, Lai Chi Wo Village, Sha Tau Kok | The Hong Kong Countryside Foundation | Meta4 Design Forum Ltd |
| 2022 | Minor Repairs to Declared Monuments 2021 (Package 2) | AMO |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2021 | Maintenance Works to Building Envelope and Associated Works for Hung Hing Ying Building and Main Building | HKU | |
| 2021 | Routine Repair and Maintenance Contract for Staff Quarters 2019/21 at The Hong Kong University of Science and Technology | HKUST | |
| 2021 | Minor Repairs to Declared Monuments 2021 (Package 1) | AMO | |
| 2021 | Re-roofing and Miscellaneous Repair at Main Block of Former Kowloon British School, 136 Nathan Road, Tsim Sha Tsui | ASD | |
| 2021 | Maintenance Works for Maryknoll House of Stanley, Hong Kong | Private owner | |
| 2021 | Preparation works for incline-rectification to middle hall of Liu Man Shek Tong Ancestral Hall, Sheung Shui | AMO | |
| 2021 | Circulation container – negative pressure isolation ward | Private owner | |
| 2021 | Renovation of Enquiry Office (M111) in June Building of St. Stephen’s Girls’ College | Private owner | |
| 2021 | Timber Survey at Peak Police Station, 92 Peak Road | ASD | |
| 2021 | Tile Roofs and Associated Roof Timber Structure Repairs to Tin Hau Temple, Causeway Bay | AMO | |
| 2021 | Investigation & Maintenance Works of Backyard of Felix Villas House 1, The University of Hong Kong | HKU | |
| 2021 | Term Contract 2019 to 2021 for Maintenance and Repair Works in Chinese Temples (Hong Kong Island) for Chinese Temples Committee | CTC | Spence Robinson Limited |
| 2021 | Building Repairs & Maintenance Term Contract 2019/2022 at The Hong Kong Polytechnic University | PolyU | |
| 2021 | Repair Works at The Warehouse Teenage Club | Private owner | |
| 2021 | Improvement Works to Man Mo Temple, Tin Hau Temple and Tung Wah Coffin Home | TWGHs | |
| 2021 | Check and Repair or Replace Defective Top Hung Window Sash at G/F of Hong Kong Observatory, 1883 Building at 134 Nathan Road, H.K. | ASD | |
| 2021 | Replacement Work of Anti-Burglary Metal Fencing in Ville De Cascade | Private owner | |
| 2021 | Improvement Project at Herbal Garden for The Chinese University of Hong Kong | CUHK |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2020 | Preservation of King Yin Lei, 45 Stubbs Road, Wan Chai | ASD | |
| 2020 | Replacement of Corroded Cast Iron Ornaments at Balustrade and Refixing of Loosen Stainless Steel Panels Outside Parapet Wall at Façade of Old Mental Hospital | ASD | |
| 2020 | Repair Works to De-bonded Plaster Frieze on Left-hand side Chamber At Yan Tun Kong Study Hall, Ping Shan | AMO | |
| 2020 | Re-roofing and Miscellaneous Repair for 3 Non-graded Building Blocks at CAS Yuen Tun Campsite | ASD | |
| 2020 | Restoration Works at Lot 210 to 213, Lai Chi Wo Village, Sha Tau Kok | The Hong Kong Countryside Foundation | Meta4 Design Forum Ltd |
| 2020 | Repair Works to De-bonded Plaster Frieze at Yan Tun Kong Study Hall, Ping Shan | AMO | |
| 2020 | Proposed Development Building at Hai Tan Street, Sham Shui Po NKIL 6506 Clubhouse & Lobbies | Private Owner | |
| 2020 | Repair to Kowloon Union Church, No. 4 Jordan Road, Kowloon | AMO | |
| 2020 | Replacement of Rainwater Down Pipe and Minor Repairs at Tung Lin Kok Yuen, 15 Shan Kwong Road, Hong Kong | AMO | |
| 2020 | Replacement of 2 nos. of Timber Doors at Annex Block and Main Building at No. 28 Kennedy Road, Central, Hong Kong | ASD | |
| 2020 | Removal of Graffiti at External Brick Wall on 2/F of Signal Tower, Blackhead Point, Tsim Sha Tsui | ASD | |
| 2020 | External Redecoration and Miscellaneous Repair Works at Waglan Lighthouse, Waglan Island | ASD | |
| 2020 | Rectification Work of Staff Entrance Sliding Door System at House 1881 | Private owner | |
| 2020 | Planned Maintenance 2019/20 – Complete Re-roofing and Redecoration at Law Uk Folk Museum | ASD | |
| 2020 | Repair of Concrete for Eliot Hall and May Hall at The University of Hong Kong | HKU | |
| 2020 | Inspection, Repair and Replacement of the Chinese Roof Tiling; and Repaint along the Corridor, Pavilions, Freature Walls and Hall at Dragon Park in Area 25, 25A & 25B, Tin Lung Road, Tin Shui Wai | ASD | |
| 2020 | External wall repair and re-roofing work at Nolkford Road No.7 | Private owner | |
| 2020 | Minor Repair Works at Bank of China Building | Private owner | |
| 2020 | Restoration of Preserved Façade at 47 Barker Road, RBL 544, The Peak, Hong Kong | Private owner | Arthur Yung and Associates Co Ltd |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2019 | Planned Maintenance 2019/20 – Repair Works at Façade of Old Mental Hospital | ASD | |
| 2019 | Repair works to external wall and internal wall at the Chapel of Jewish Cemetery, No. 13 Shan Kwong Road, Happy Valley | Private owner | |
| 2019 | Repair Water Seepage at Wall at No. 28 Kennedy Road, Main Building, Central, HK | ASD | |
| 2019 | Maintenance Works of Hau Mei Fung Ancestral Hall in No. 7, 9th Lane, Kam Tsin Village, Sheung Shui, N.T. | Private owner (under FAS) | |
| 2019 | Minor Repair to Declared Monuments 2019 | AMO | |
| 2019 | Replacement of Defective Window System and Associated Works for University Hall, The University of Hong Kong | HKU | |
| 2019 | Repair of External Wall of Judges’ Office at the Front and Side Elevations of Old South Kowloon District Court (Lands Tribunal) | ASD | |
| 2019 | Repair of the Timber Pitched Roof System at “Capter Hall” – Gatekeeper’s Lodge of Marble Hall, No.1 Conduit Road, Mid-levels | ASD | |
| 2019 | Repairing Works for the External Wooden Door on 1/F and Damaged Wooden Window on G/F of Bethanie Campus at No. 139 Pokfulam Road, Hong Kong | APA | |
| 2019 | Main Contract Works for Addition and Alteration Works for The Incorporated Management Committee at General Office of Shung Tak Catholic English College | Private owner | |
| 2019 | Supply and install wooden Cabinet at Hong Kong Baptist University | HKBU | |
| 2019 | Twin Cone Tensioned Structure of Siu Sai Wan – Island Resort | Private owner | |
| 2019 | Metal Balustrade and Railing Replacement works for La Hacienda at 27-33, Mount Kellett Road, The Peak | Private owner | |
| 2019 | Slope / Retaining Wall Maintenance Works for features at Granville Garden, 18 Pik Tin Street, Tai Wai | Private owner | |
| 2019 | Construction of New Dog House at First Floor (1/F) of Pi Chiu Building | CUHK | ISS Building Consultancy Limited |
| 2019 | Construction and installation of metal railing at Roof at Yuen Long Catholic Secondary School – Phase 2 | Private owner | WCWP International Limited |
| 2019 | Term Contract 2016 to 2018 for Maintenance and Repair Works in Chinese Temples (Hong Kong Island) for Chinese Temples Committee | CTC | Spence Robinson Limited |
| 2019 | Cleaning Works for the Brick Carving to Man Mo Temple Compound, Sheung Wan | TWGHs | |
| 2019 | Main Contract Works for Addition and Alteration Works for Air Conditioning System in Staff Room and Room 117A of Shung Tak Catholic English College | Private owner | |
| 2019 | Enhancement works to the manhole cover at outdoor area around The Jockey Club of Public Health and Primary Care | CUHK | |
| 2019 | Addition works for A&A works for additional steel platform at roof floor, main block, ST. Teresa’s Hospital | Private owner | |
| 2019 | Supply and install corrugated sheet roof at United Christian Hospital | Private owner | |
| 2019 | Alteration and Addition Works for New Pitched Roof System of Lift Shaft of 3 Coombe Road Hong Kong | Private owner | |
| 2019 | Reinstatement Work of Sport Facilities in 7/F Podium Roof at Shun Tak Centre , 168-200 Connaught Road Central, Hong Kong | Private owner |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2018 | Renovation Works to “The Kingston Hills” at No.3 Yat You Avenue, Tai Po Kau | Private Owner | |
| 2018 | Minor Repair Package to Declared Monuments (I) 2018 | AMO | |
| 2018 | Minor Repair Package to Declared Monuments (II) 2018 | AMO | |
| 2018 | Summer Repair Works 2018 to S.K.H. All Saints’ Middle School at Pak Po Street, Mong Kok, Kowloon | Private owner | Bright Solution Consulting Limited |
| 2018 | Construct on Works at Shop 15, G/F, Central Building, 1-3 Pedder Street, Central ,HK | Private owner | |
| 2018 | E&M Works – Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road – Section between HKSAR Boundary and Scenic Hill | HKSAR | |
| 2018 | MBIS Prescribed Repair Works at Building A, Tsing Tim Street, Tsing Yi | Private owner | Bright Solution Consulting Limited |
| 2018 | Urgent Structural Support Works to Middle Hall at Tang Chung Ling Ancestral Hall, Fanling | AMO | |
| 2018 | Assembly Hall Floor Finishes replacement Works and Drainage & Sanitary Fittings Replacement Work of Dormitory A&B at Wu Kwai Sha Youth Village | YMCA | |
| 2018 | Fringe Club Phase II – Renovation Works | Private owner | Tom Ip & Partners Architects |
| 2018 | Planned maintenance 2016 at Former Royal Hong Kong Yacht Club | ASD |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2017 | Improvement Works for Roof R.C. Parapet Wall at Madam S.H. Ho. Hostel for Medical Student PWH | CUHK | ISS Building Consultancy Limited |
| 2017 | Repair Damaged Pitched Roof of Annex Block at Old Aberdeen Police Station at 116 Aberdeen Main Road | ASD | |
| 2017 | Provision of Building Condition and Paint Removal Investigation Works to Man Mo Temple Compound, Sheung Wan | AMO | |
| 2017 | Renovation works at TWGHs Wong Tai Sin Fortune- Telling and Oblation Arcade, Lung Cheung Road | TWGHs | |
| 2017 | Renovation Work for Main Lobby and Lift Lobby on G/F, No. 111, Lee Nam Road, Ap Li Chau, H.K. | Private owner | |
| 2017 | Construction of new external block wall and proprietary folding partition at Fuk Tak Education Society Primary School | Private owner | Ho & Partners Architects |
| 2017 | Construction and installation of metal railing at Roof at Yuen Long Catholic Secondary School | Private owner | WCWP International Limited |
| 2017 | Enhancement works to the channel and manhole cover at outdoor area near PEC and CLKS Media Science Building | CUHK | |
| 2017 | Repair of Deteriorated Timber Staircase at Mong Kok Police Station Old Block | ASD | |
| 2017 | Design, supply and install Ventilation system on 3/F Paint testing workshop at CITA Hong Kong Construction Industry Trade Testing Centre | CIC | |
| 2017 | Replacement of Fire Rated Glass Panels at Entrance no.4 on UG Floor, Wing On Plaza | Private owner | |
| 2017 | Paint Works for YOHO Footbridge | Private owner | |
| 2017 | Alternation and Addition Works – Construction of New Pedestrian Exit and Metal Gate at PLK Riverain Primary School Renovation Project | Private owner |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2016 | Renovation Works at J-change, Hong Kong | Private owner | |
| 2016 | Additional Full Size Self-closing Enclosed Door at Guest Toilets, 2/F, Conference Lodge of The OUHK | OUHK | |
| 2016 | Planned Maintenance 2016 for The Former Yamen Building, Kowloon Walled City Park | ASD | |
| 2016 | Apply waterproofing system on roof at Nestle’s Ice-Cream & Chilled Business Storage, Yuen Long | Private owner | |
| 2016 | Renovation Works at Tack Ching Kindergarten | Private owner | |
| 2016 | Supply and install steel platform at Shak Chung Shan Memorial Catholic Primary School | Private owner | |
| 2016 | Building & E/M Alteration Works at Room 7152 & 7152X | HKUST | |
| 2016 | Strengthening and Improvement Work to Wooden Floor System at Concert Hall and Recital Hall for The Hong Kong Academy for Performing Arts | HKAPA | |
| 2016 | Modification Works at SIH & PHD and Provision of Bus Shelter and Yellow Lines at LR | MTR | |
| 2016 | Provision of Store Rack and Fitting-out Works on Level 4 at Jubilee College of The OUHK | OUHK |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2015 | Alternation works of Roof at Ideal House, 71, CAINE ROAD, MID-LEVELS, HK | Private owner | |
| 2015 | Renovation of 4/F Sky Garden at Lok Sin Tong Wong Chung Ming Secondary School | Private owner | |
| 2015 | Track Floodlight Replacement Project for Sha Tin Racecourse and Happy Racecourse For The Hong Kong Jockey Club | Private owner | Parsons Brinckerhoff |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2014 | Supply Tailor-made Granite Surface Channel Cover at The Hong Kong Academy for Performing Arts | HKAPA | |
| 2014 | Refurbishment / Re-fit of Existing Retail Unit for Harry Winston (Hong Kong) | Private owner | Rocco Design Architects Limited |
| 2014 | Renovation Works for SAHK Apleichau Pre-school Centre at 1-16, 22 & 24, Ground Floor, Lei Yee House | Private owner |
| Year | Project | Client | Consultant |
|---|---|---|---|
| 2013 | Fit-out Works for 24/F, China Overseas Building, 139 Hennessy Road | Private owner | |
| 2013 | Carpentry &Joinery Works for The Tsung Tsin, Tai Po | Private owner | Kamyin Consultants Ltd |
| 2013 | Additional & Alternation Works at Shung Tak Catholic English College, 1 Hung Tak Road, Hung Shui Kiu, Yuen Long, N.T. | Private owner | Citiway Consultants Ltd. |
| 2013 | Provision of Restoration and Redecoration of Roofs and Walls at King Law Ka Shuk, Tai Po Tau Tsuen, Tai Po | AMO | |
| 2013 | Replacement of Rubber Floor of Common Area of Theatre Block at The Hong Kong Academy for Performing Arts | HKAPA | |
| 2013 | Renovation Works for Pentecostal Church of Hong Kong Tai Wo Nursery School At 3/F., Neighbourhood Community Centre, Tai Wo Estate, Tai Po, N.T. | Private owner | |
| 2013 | Renovation Works for Tuen Mun EFCC shop 7 & 8 Brilliant Garden, Tuen Mun, N.T. | Private owner | Vincent Lai Architects Ltd. |
| 2013 | Dismantle, Removal of an abandoned shelter and relocation of RSP High Volume Particulate Sampler at Sham Shui Po Air Quality Monitoring Station | EPD | |
| 2013 | Alternation and Addition Works – Construction of New Extension of G/F & Cockloft) No. 11, Matheson Street, Caauseway Bay | Private owner | Ng Ka Wai & Associates Ltd |